08.04.2022

Construction work is still going on the territory of the residential complex "Minopolis Divnoe" in Moscow region
Every day brings us closer to making the residential complex “Minopolis Divnoe” your home, says the representative of the developer JSC “City-XXI century”, for which STUDIO-TA fulfilled the architectural concept. The developer informs that construction work at the facility is being carried out dynamically: construction is going on in several buildings at the same time.
In parallel, landscaping works are continuing at the facility. Among the features of the “Minipolis Divnoe”, it is worth noting closed safe courtyards, unique architecture, a comfortable space for life and creativity, an open atmosphere of good neighborliness.
We also remind that on November 25th last year a section of the road connecting “Minopolis Divnoe” and residential complex “Green Alleys” with the M-4 “Don” highway was officially opened.
Resource: https://xn--b1adek0ag.xn--p1ai/about/dynamics-construction/common/2022/month_4/